Electric Toothbrush Manufacturer & Oral Care OEM/ODM Partner

Develop electric toothbrushes, water flossers, and private-label oral care products with an OEM/ODM partner built for B2B brands.

RELISH AT A GLANCE

20,000+ m2

Factory space

Exterior of Relish's oral care manufacturing facility, showing the buildings and entrance.
350+

Team members

Relish team office with staff working at open-plan workstations.
30+

R&D team members

A pink electric toothbrush handle secured in a product testing fixture.
Product Testing
12+

Production lines

Workers assembling oral care products along Relish's production lines.
120+

Export countries

Map showing Relish's international oral care export network.

INSIDE OUR FACTORY

Electric Toothbrush & Oral Care Manufacturing

Explore our in-house oral care manufacturing capabilities, from product design and tooling to production, quality control, and delivery.

R&D & Custom Tooling

Product design and tooling tailored to your specifications.

Production & Assembly

Component manufacturing and assembly for your oral care products.

Quality Control

Product inspection and testing to check quality before shipment.

Traceability & Delivery

Production documentation and delivery coordination for your orders.

Explore Manufacturing Capabilities View Electric Toothbrushes

Inside Our Manufacturing FacilityR&D · Tooling · Production · Quality Control

WAYS TO WORK WITH US

OEM, ODM & Private Label Solutions

Choose the right path for your brand: manufacture your design, develop a new product, customize an existing model, or source ready-to-ship stock.

OEM Manufacturing

OEM Manufacturing

Bring your electric toothbrush design into production with custom tooling, PCB programming, assembly, and testing.

Explore OEM Manufacturing
ODM & Product Development

ODM & Product Development

Turn your oral care concept into a product through CAD design, material selection, and prototyping.

Explore ODM Services

PRODUCT COLLECTIONS

Oral Care Products for Your Brand

Explore electric toothbrushes, water flossers, and everyday oral care products
for OEM, ODM, and private-label projects.

View All Oral Care Products ↗
Tongue Scrapers

Tongue Scrapers

Stainless steel and silicone options for standalone products or branded oral care kits.

Globally Certified. Uncompromising Quality.

Relish factory quality management certificates and audit documents Relish product compliance certificates and test documents

Trusted by Oral Care Brands

International retailer logos displayed by Relish Global brand logos displayed by Relish
Direct Factory Connection

Build Your OEM/ODM Quote Request

Ready to build? Specify your parameters using our interactive tool below. We will compile your choices into a formal technical quote.

Let’s discuss your project

Share a few details about your oral care project. Our team can help with product options, customization and samples.

We use your details to respond to your inquiry. Privacy Policy

Have specifications ready?

Use the detailed form to share technical requirements.

Victor Lee

Victor Lee

Global Key Accounts Director

WhatsApp Live Online

"We guarantee that when you submit an RFQ, your project is handled not by a basic agent, but by a full dedicated team of structural engineers, packaging designers, and compliance officers."

Email Address
sales@relish-tech.com
WhatsApp
+86 18033430173
Phone Call
+86 13794989121
WeChat
VictorRelish
Factory & HQ Address

Building A, Julong Yida Industrial Park, Baolong Street, Shenzhen, China

Schedule Live Video Factory Tour

24h Global Quoting & Sampling Response

First-round pricing estimates are delivered in under 12 hours, complete with shipping quotes.

Detailed Quote Request

1. Product & Quantity
2 Custom Specs
3. Contact Details

1. Select Product Categories *

Electric Toothbrush
Water Flosser
U-shaped Brush
Kids Toothbrush
Manual Toothbrush
Floss & Picks
Tongue Scraper
LED Teeth Whitening
Brush Heads
Travel & Storage Accessories
UV Care Accessories
Other / Help Me Choose

2. Choose your estimated purchase volume *

Our standard MOQ is 1,000 units. Flexible quantities can be discussed based on your project.

3. Select Customization Scope Required

Private Label Logo

Laser engraving or screen printing

Custom Pantone Colors & Finishes

Custom body colors, textures and UV coating

Fully Custom Packaging

Unique rigid box structure, booklets & accessories

New Mold R&D (ODM)

3D mockups and exclusive structures from scratch

PCB & Bristle Function Upgrade

Custom brushing/flossing modes, timer settings, and smart pressure sensors.

Bristle & Brush Head Customization

DuPont/Pedex filaments, charcoal/sensitive types, and custom head shapes.

4. Target Unit Price (Ex-Factory)

Value ($3.0 - $6.0)
Mainstream ($6.0 - $12.0)
Premium Smart ($12.0+)
Not sure yet

5. Upload Concept Design or CAD file (Optional)

Click to Select a File

PDF, PNG, JPG, ZIP, STEP or IGES; less than 10 MB. ZIP CAD files if the format is not accepted.

Uploaded with your inquiry; our team receives a download link.

filename.stp 0%

File ready — will upload when you submit.

6. Contact Information *

Innovation That Sets Your Brand Apart

Two proprietary technologies your competitors don’t have.

2025 Innovation

Rotasonic™ — World's First 3-in-1 Electric Toothbrush

The first electric toothbrush to combine rotating, sonic, and vibrosonic technologies in a single device.

Equipped with an ultra-quiet vibrosonic motor, AI brush-head recognition, gum-friendly bristles, and an intuitive LCD interface — delivering the cleaning power of Oral-B and the comfort of Philips in one unified platform.

A next-generation electric toothbrush by Relish Tech, showcasing maximum efficiency and deep cleaning for plaque removal, featuring a smart screen.
2024 Breakthrough

Vibrosonic™ — Next-Generation Brushing Technology

A next-generation brushing technology engineered for performance, comfort, and true differentiation.

The Vibrosonic Toothbrush enhances traditional sonic brushing by adding a 15°–60° vertical oscillation, simulating the dentist-recommended Bass technique through AI-driven control.

The result: superior plaque removal, gentler gum care, and an engaging brushing experience for users of all ages.

Vibrosonic electric toothbrush demonstrating vertical oscillating brush-head movement

FDA-Registered & Medical-Grade

Operating under ISO 9001/13485 & FDA registration. With complete MSDS and CPSR documentation, we guarantee seamless regulatory compliance for your brand globally.

SEDEX 4P Audited Supply Chain

Rigorously audited for labor rights, health & safety, and environmental compliance. Partner with a zero-risk manufacturer that easily passes the stringent vendor audits of global retail giants.

15+ Years of OEM/ODM Excellence

Trusted by leading global dental clinics and major retailers. From ID design to mass production, we deliver fully customized electric toothbrush and oral irrigator solutions that elevate your brand.

Client feedback on Relish electric toothbrush OEM manufacturing, compliance and delivery
Ready to Grow Your Oral Care Business with a Trusted OEM/ODM Partner?

Get Our Free Quote Today!

Our team of oral care experts has supported thousands of brands in launching high-quality, cost-effective private label products. From concept to delivery, we help you reduce OEM/ODM costs and scale your business with confidence.

Request a free quotation now and get a tailored strategy for profitable growth.

Why Global Brands Choose Relish as Their Electric Toothbrush Manufacturer

Defect Rate
< 0.3 %
On-Time Delivery
100 %
Quality Control
23 -Step
Customizable smart electric toothbrush lineup with multiple brush heads and display configurations
Premium Private Label

Premium Private Label Solutions

Launch your oral care line with confidence. Backed by 15+ years of manufacturing expertise, we offer end-to-end services from initial concept to final delivery.

✅ Custom branding, bespoke packaging, and fully compliance-ready products tailored for your target market.

Dental Formula RD

Customized Product R&D

Innovate faster with our in-house engineering team. We develop exclusive electric toothbrushes and water flossers designed to dominate the competitive market.

✅ Fully customizable core specs—including motors, batteries, and smart brushing modes—meeting strict global standards.

Free Product Samples

Free Product Samples (No Risk)

Verify our superior quality before placing a bulk order. We provide fast-tracked, curated sample kits of our top-performing oral care models.

✅ Zero inventory risk, rapid global shipping, and dedicated support for your procurement team.

Request Free Samples

Trusted by Global Oral Care Brands

⭐⭐⭐⭐⭐ 4.9/5
Customer rating · Defect rate < 0.3%
🤝 100%
On-Time Delivery
🌍 120+
Countries Exported
Partnering with Relish for our sonic toothbrush line was the best decision. Their sonic motors are incredibly stable, and the DuPont bristles meet strict FDA standards. They handled our OEM custom packaging flawlessly.
We've worked with several factories in Shenzhen, but Relish stands out for their R&D capability. Their water flosser pump design resolved the leakage issues we faced with previous suppliers. CE & RoHS compliance made import seamless.
Fast turnaround on prototyping and exceptional mold quality. The U-shaped 360° toothbrushes we co-developed hit the UK market 2 weeks ahead of schedule. Their communication is transparent and highly professional.
Partnering with Relish for our sonic toothbrush line was the best decision. Their sonic motors are incredibly stable, and the DuPont bristles meet strict FDA standards. They handled our OEM custom packaging flawlessly.
We've worked with several factories in Shenzhen, but Relish stands out for their R&D capability. Their water flosser pump design resolved the leakage issues we faced with previous suppliers. CE & RoHS compliance made import seamless.
Fast turnaround on prototyping and exceptional mold quality. The U-shaped 360° toothbrushes we co-developed hit the UK market 2 weeks ahead of schedule. Their communication is transparent and highly professional.
The Japanese market has zero tolerance for defects. Relish's rigorous QC processes, from raw materials to final assembly, ensured our electric toothbrushes passed every inspection. A highly reliable ODM manufacturer.
We scaled our Amazon FBA business significantly thanks to their scalable manufacturing capacity. Even during peak seasons, they maintain strict lead times for our bulk orders of teeth whitening kits and replacement heads.
Cost-effective without compromising on quality. The battery life on their electric toothbrushes is exactly as advertised. They also provided complete customs clearance documents promptly. Great factory to work with.
The Japanese market has zero tolerance for defects. Relish's rigorous QC processes, from raw materials to final assembly, ensured our electric toothbrushes passed every inspection. A highly reliable ODM manufacturer.
We scaled our Amazon FBA business significantly thanks to their scalable manufacturing capacity. Even during peak seasons, they maintain strict lead times for our bulk orders of teeth whitening kits and replacement heads.
Cost-effective without compromising on quality. The battery life on their electric toothbrushes is exactly as advertised. They also provided complete customs clearance documents promptly. Great factory to work with.
What impresses me most is their flexibility. Whether it's adjusting the motor frequency for our water flossers or customizing the private label packaging, their engineering team is incredibly supportive and responsive.
Relish provides excellent value. Their bamboo toothbrushes and UV sanitizers have been top sellers for us. The factory's commitment to sustainable development also aligns perfectly with our brand values.
We source interdental brushes and tongue scrapers directly from Relish. The medical-grade materials and ergonomic designs have received excellent feedback from our patients. A true professional oral care manufacturer.
What impresses me most is their flexibility. Whether it's adjusting the motor frequency for our water flossers or customizing the private label packaging, their engineering team is incredibly supportive and responsive.
Relish provides excellent value. Their bamboo toothbrushes and UV sanitizers have been top sellers for us. The factory's commitment to sustainable development also aligns perfectly with our brand values.
We source interdental brushes and tongue scrapers directly from Relish. The medical-grade materials and ergonomic designs have received excellent feedback from our patients. A true professional oral care manufacturer.

Compliance, Quality, Compatibility

Advanced injection molding and tooling machinery inside our factory, ensuring customized solutions and on-time delivery for oral care brands.

Your Vertically Integrated OEM Electric Toothbrush Factory

Founded in 2012, Relish is a National High-Tech Enterprise specializing in OEM/ODM oral care manufacturing. From our ISO-certified 20,000㎡ facility in Shenzhen, we manage the full product lifecycle—in-house R&D, precision tooling, automated assembly, and rigorous QC—delivering compliant, market-ready solutions to brands worldwide.

Capabilities at a glance:

  • 350+ employees and 30+ R&D team members
  • Private label electric toothbrushes & water flossers
  • Full certification: FDA, CE, FCC, RoHS, CB, ISO 13485
  • Factory-direct pricing for private label, retail, and wholesale
Technology Evolution

Brushing Technology Evolution

From established sonic and rotating systems to our Vibrosonic™ and Rotasonic™ technologies, Relish continues to develop new approaches to electric toothbrush motion.

  1. Sonic Motion

    Sonic

    Moves the brush head rapidly from side to side, producing high-frequency bristle motion across the tooth surface.

    High-speed side-to-side motion
  2. Rotary Motion

    Rotating

    Uses a round brush head that oscillates back and forth in a rotating motion, creating a tooth-by-tooth mechanical brushing action.

    Oscillating-rotating motion
  3. Ultrasound

    Ultrasonic

    Uses ultrasound at frequencies in the megahertz range, operating far above conventional sonic brush-head vibration.

    MHz-range ultrasound
  4. Relish Development

    Vibrosonic™

    Combines a 60° oscillating motion with 31,000 VPM sonic vibration, creating a 2-in-1 brushing system driven by a servo motor.

    60° oscillation + sonic vibration
  5. Latest Development

    Rotasonic™

    Combines sweep, oscillation and sonic motion in one 3-in-1 brushing architecture, bringing three distinct motion types into a single system.

    Sweep + oscillation + sonic
Relish team group photo at the 2026 company gathering

Your Manufacturing Partner — Inside & Out

At Relish, our team is composed of elite engineers, certified testing experts, and dedicated customer service professionals—each driven by a shared passion for oral care innovation. For us, it’s not just a job—it’s a mission to deliver exceptional quality, cutting-edge design, and reliable manufacturing excellence.

This commitment has earned us recognition as a trusted OEM/ODM partner for global brands in the wholesaler, retailer, and dental sectors.

Our clients consistently praise our on-time delivery, technical support, and compliance-ready products—from electric toothbrushes to oral care solutions.

Happy Team

Passionate People, Reliable Products

A passionate, engaged team delivers the best outcomes for clients. Our engineers, QC specialists, and account managers treat every project as their own — because your brand's reputation depends on ours.

Crystal clear Management

Crystal-Clear Project Management

Real-time order tracking, automated production reports, and a dedicated account manager for every client. You always know where your order stands — no chasing, no surprises.

Transparent Flow

Full Manufacturing Transparency

We open up our full production workflow to every client. From tooling to final inspection, every action item and milestone is documented and shared — so you stay in control at every phase.

Private Label Electric Toothbrush Manufacturer

Launch your branded electric toothbrush or water flosser with fast turnaround, competitive pricing, and full compliance—partner with a trusted OEM/ODM factory in China.

fess ico1

1.2M+ Monthly Capacity

20,000㎡ facility with 12 automated lines to handle global high-volume OEM orders effortlessly.

fess ico2

In-House R&D & Engineering

Expert support for concept development, 3D CAD modeling, prototyping, and functional testing.

fess ico3

3-7 Days Rapid Prototyping

Dedicated in-house CNC workshop ensures fast sample delivery for your market validation.

fess ico4

Automated Assembly Lines

Streamlined manufacturing ensuring high yield rates and zero delays for your bulk orders.

fess ico5

In-Stock Wholesale Options

20+ ready-to-ship models supporting low-MOQ private labeling and fast market entry.

fess ico6

Global Logistics Support

Reliable shipping via air or sea freight to 50+ countries with full customs documentation.

fess ico7

23-Step Quality Control

100% pre-shipment inspection. Fully compliant with CE, FCC, RoHS, and FDA standards.

fess ico8

Factory-Direct Economics

Transparent pricing with zero hidden fees. Maximize your profit margins without sacrificing quality.

Powering Your Oral Care Brand's Growth
Premium OEM Solutions—Engineered for Quality, Priced for Scale.

As a premier oral care products supplier, we drive sustainable growth for our partners through industry-leading manufacturing and resilient supply chain strategies. We empower your business with an uninterrupted supply of innovative products.

More Than Just a Manufacturer—Your Strategic Partner

We deliver end-to-end OEM/ODM services, from initial conceptualization to final production.

Our team acts as an extension of your business—providing expert industrial design, cost-optimization consulting, and dedicated logistics support to ensure your product succeeds in a competitive market.

Our services are loved by large-small brands:
number 1 icon

Complimentary ID & Prototyping

No blueprints? No problem. Our R&D team provides free industrial design (ID) and rapid 3D prototyping to bring your electric toothbrush concept to life.

number 2 icon

Fast Sampling & Flexible Order Quantities

Review samples before production. Our standard MOQ is 1,000 units, with flexible quantities available by discussion.

number 3 icon

Market-Ready Private Label

Choose from 20+ proven, best-selling designs. Fully customize your packaging, laser-engraved logos, and operating modes to launch your brand instantly.

Oral Care Resources & Insights